NOTE: YOU MUST EDIT THIS PAGE FIRST
Want to Help?
Check out our current projects and what type of help do we need, get in touch with the responsible members if you want to apply to something.
Have you joined your local chapter yet?
Participating in projects is usually something that can be accomplished in online mediums. Naturally, most of the times, this does not require you to be at a certain time or place to work on a given task. Participating in projects or teams should be complementary to the local activism in chapters.
Want to organize something?
If you want to organize a project you are advised to follow the structure of displaying information below. After you have organized it in that format, email "
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
" and post the proposal in the forum.
Current Projects:
| Name: | Title of the project |
| Link: | Can be a forum post, atrium link, etc. As long as it has more information |
| Contact: | Insert link here to private message the person responsible |
| Objective: | State the objective/goals of such project |
| Needs: |
State what do you need and for what. Example: - A person with good writing skills to draft X document - A graphic designer to design the graphical aspect of the document |
